Customization: | Available |
---|---|
Application: | Construction, Overhead, Underground, Industrial, Power Station, Telecommunication, Computer, Car |
Voltage: | Low and Medium Voltage Cable |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Comparison Dimension | AAC (All Aluminium Conductor) |
AAAC (All Aluminium Alloy Conductor) |
ACSR (Aluminium Conductor Steel Reinforced) |
Product Name & Standards | AAC | AAAC (6101-T81) | ACSR |
IEC 61089 / ASTM B230 | IEC 62004 / ASTM B399 | IEC 61089 / ASTM B232 | |
Material & Appearance | Pure Aluminium Strands | Al-Mg-Si Alloy Strands | Aluminium Layers + Galvanized Steel Core |
Silvery surface, no coating | Anti-oxidation treated, matte finish | Outer Al shiny, steel core visible in cross-section | |
Key Selling Points | Lightweight & Cost-effective | Superior corrosion resistance (salt/fog) | Ultra-high tensile strength (1340MPa steel core) |
High conductivity (61% IACS) | 30% stronger than AAC | Ideal for long spans | |
Primary Applications | Urban LV distribution | Coastal/Industrial zones | Extra-HV transmission (≥220kV) |
Short-span power lines (<100m) | Medium-span transmission (100-300m) | River crossings/Mountain routes (>500m span) | |
Certifications | CE, RoHS | TUV Rheinland (Salt Spray Test) | ASTM B232-18 |
ISO 9001 (Factory Audit Report) | IEC 62004 Compliance | IEC 61089 Ed.3.0 | |
Packaging & Logistics | Standard Export Package: | Corrosion-Resistant Packaging: | Heavy-Duty Packaging: |
- Wooden drums (IPPC marked) | - VCI paper + desiccant | - Customized steel crates | |
- Moisture-proof film | - Steel-reinforced edges | - Anti-rust coating | |
Lead Time: 15-20 days | Lead Time: 18-25 days | Lead Time: 25-35 days | |
Cost Efficiency | Best Price: $1,200-1,800/ton (FOB China Port) | Value for Money: $1,800-2,500/ton | Premium Pricing: $2,200-3,000/ton |
(Lower lifetime maintenance cost) | (Justified for critical infrastructure) | ||
Payment & Warranty | 30% T/T in advance, 70% before shipment | Flexible L/C at sight | Milestone payments (project-based) |
10-year warranty | 15-year anti-corrosion warranty | 20-year structural integrity guarantee |